Project Experience Details
No photos available.
Overview
- Job Ref: 197
- Type: Cryogenic Plant
- Size: 200 MMscfd
- Location: North Texas, United States
- Status: Complete
Project Description
The plant is designed to process 200 MMscfd of inlet gas utilizing a refrigerated GSP Turbo-Expander process. The plant will produce 1,112,800 GPD of Y-Grade product and 157.8 MMscfd of residue gas by recovering 93% of the ethane. The plant also includes a 60 gpm amine product treater to treat the product to less than 1,000 ppmw CO2. The refrigeration system is a conventional two-stage propane system with interstage flash economizer. About 4,400 BHP is required at summer operating conditions.
Block Flow Diagram
Click on the image below to enlarge the block flow diagram for more details.

