Copyright2003© Thomas Russell Co.

Home About Us Projects Products Capabilities Shop Contact Us


Home > Project Experience > 158

Project Experience Details


Interactive View - use the on-screen controls to rotate and zoom.

Overview
Job Ref:  158
Type:  Helium Extraction Plant
Size:  25 MMscfd
Location:  West Oklahoma, United States
Status:  Active

Project Description
The plant is designed to process 25 MMSCFD of gas containing 0.85 mol-percent of Helium and 31 mol-percent of Nitrogen. The Cryogenic Unit provides the Cold Box with 60 Mol-percent Methane, a 35 mol-percent nitrogen gas stream, and recovers a high percentage of ethane as NGL. This is achieved by cooling the inlet gas with the Cold Box return streams, refrigeration, and expansion in the Turbo-Expander. The overhead from the Demethanizer is the 60/35 feed to the Cold Box. The Cold Box utilizes expansion and internal refrigeration to separate the gas into three product streams that are used for exchange with the inlet gas. They are the low pressure residue containing less than 2 mol-percent nitrogen, the nitrogen vent containing less than 1.5 mol-percent methane, and the crude helium. The demethanizer operates in either the ethane recovery or rejection modes producing a residue gas stream and an NGL stream that meets either a Y-Grade spec or a 205 psig vapor pressure ethane-plus product.

Block Flow Diagram
Click on the image below to enlarge the block flow diagram for more details. 
     


   Home · About Us · Personnel · Products · Project Experience · Technical Capabilities · Project Management · Shop · Links · Contact Us 
   Refining · Gas Conditioning · Gas Liquids Recovery · NGL Upgrading


   Thomas Russell Co. · 7050 South Yale Avenue, Suite 210 · Tulsa, Oklahoma · 74136 · Phone (918) 481-5682 · Fax (918) 481-7427 · Email sales@thomasrussellco.com
   Copyright (c) 2003-2010, Thomas Russell Co., All Rights Reserved