Copyright2003© Thomas Russell Co.

Home About Us Projects Products Capabilities Shop Contact Us


Home > Project Experience > 196

Project Experience Details

Interactive View - use the on-screen controls to navigate to different views and rotate or zoom.

Overview
Job Ref:  196
Type:  Cryogenic Plant
Size:  150 MMscfd
Location:  West Texas, United States
Status:  Complete

 
Project Description
The Cryogenic plant is designed to process 150 MMcfd of inlet gas utilizing a refrigerated GSP Turbo-Expander process.  The plant will produce 955,000 GPD of Y Grade product and 106 MMcfd residue gas by recovering 91% of the ethane and essentially 100% of the propane and heavier hydrocarbons.  The plant also includes a 250 GPM amine gas treater.  The refrigeration system is a conventional two-stage program system with interstage flash economizer.  About 5,600 BHP is required at summer operating conditions.
 

   Home · About Us · Personnel · Products · Project Experience · Technical Capabilities · Project Management · Shop · Links · Contact Us 
   Refining · Gas Conditioning · Gas Liquids Recovery · NGL Upgrading


   Thomas Russell Co. · 7050 South Yale Avenue, Suite 210 · Tulsa, Oklahoma · 74136 · Phone (918) 481-5682 · Fax (918) 481-7427 · Email sales@thomasrussellco.com
   Copyright (c) 2003-2010, Thomas Russell Co., All Rights Reserved